Dexter Wilson Engineering, Inc. is a sanitary engineering firm which provides water, wastewater, and recycled water expertise to cities, public agencies, special districts and private companies. Dexter Wilson Engineering, Inc. was established in 1983 and since that time has been involved with the planning, design, and construction management of civil engineering projects relating to water, wastewater, and recycled water systems.
We are dedicated to the timely completion of quality engineering reports and design work. We take pride in our work and make every effort to meet our client's needs.
We are dedicated to the timely completion of quality engineering reports and design work. We take pride in our work and make every effort to meet our client's needs.
Services
This project involved the design of a new pump station with an initial capacity of 850 gpm and an ultimate design capacity of 1,700 gpm.
Planning and pre-design studies as well as final engineering drawings and specifications were prepared by Dexter Wilson Engineering, Inc.
Dexter Wilson Engineering, Inc. also provided as-needed engineering services pertaining to the bidding and construction phase of the Poinsettia Sewage Lift Station project.
These tasks included responding to questions and/or clarifications during bidding; review of submittals; responding to requests for information from the Contractor; attending pre-construction meetings; attending project progress meetings as required; performing site visits as required; assisting in observing operational test for the facility; and completing as-built drawings.
Planning and pre-design studies as well as final engineering drawings and specifications were prepared by Dexter Wilson Engineering, Inc.
Dexter Wilson Engineering, Inc. also provided as-needed engineering services pertaining to the bidding and construction phase of the Poinsettia Sewage Lift Station project.
These tasks included responding to questions and/or clarifications during bidding; review of submittals; responding to requests for information from the Contractor; attending pre-construction meetings; attending project progress meetings as required; performing site visits as required; assisting in observing operational test for the facility; and completing as-built drawings.
Design of a water system for a 3,500 unit planned development in the City of Corona.
The water system included a 7 million gallon per day filtration plant, two water pumping stations and a reservoir.
Preparation of a water master plan for a 3,000 unit planned development in the City of Chula Vista.
This planned community was on the end of the existing water system and the entire water delivery system for the Otay Water District was examined and recommendations were made for upgrading their delivery system to supply water to this development.
The water system included a 7 million gallon per day filtration plant, two water pumping stations and a reservoir.
Preparation of a water master plan for a 3,000 unit planned development in the City of Chula Vista.
This planned community was on the end of the existing water system and the entire water delivery system for the Otay Water District was examined and recommendations were made for upgrading their delivery system to supply water to this development.