Practicing for over 25 years, Hultgren - Tillis Engineers provides geotechnical engineering services for industrial, municipal, commercial and civil works projects. Its projects include new and upgraded levees, marine structures, slope stabilization for roads and drainage facilities, industrial process equipment and storage tanks, pipelines, buildings, marsh restoration, and miscellaneous foundation engineering projects.
Services
Mr. Tillis is responsible for day to day operations, while concurrently managing and overseeing numerous geotechnical engineering projects each year.
His experience includes management of complex levee, dam and earthwork projects for local and state agencies.
His recent experience includes planning, design and implementation of construction for over 100 miles of levees in the Sacramento-San Joaquin Delta.
He has an excellent track record for pushing projects through the design phase into and through the completion of construction.
His experience includes management of complex levee, dam and earthwork projects for local and state agencies.
His recent experience includes planning, design and implementation of construction for over 100 miles of levees in the Sacramento-San Joaquin Delta.
He has an excellent track record for pushing projects through the design phase into and through the completion of construction.
Hultgren - Tillis Engineers' water resources work has been primarily for levee districts, municipal improvement districts, conservation agencies, and private land owners.
More than half of Hultgren - Tillis Engineers' professional effort in recent years has been on flood protection infrastructure projects.
Hultgren - Tillis Engineers personnel have provided engineering design and/or evaluation on 30 dams and hundreds of miles of levees and channels.
Delta Levee Rehabilitation (Sacramento-San Joaquin River Delta) - Hultgren - Tillis Engineers has undertaken geotechnical evaluations for hundreds of miles of flood control levees.
More than half of Hultgren - Tillis Engineers' professional effort in recent years has been on flood protection infrastructure projects.
Hultgren - Tillis Engineers personnel have provided engineering design and/or evaluation on 30 dams and hundreds of miles of levees and channels.
Delta Levee Rehabilitation (Sacramento-San Joaquin River Delta) - Hultgren - Tillis Engineers has undertaken geotechnical evaluations for hundreds of miles of flood control levees.
Hultgren - Tillis Engineers has policies and procedures in place to meet the requirements for its on-going work at refineries and chemical plants.
This includes a drug-free workplace, industrial site safety training, and TWIC badges.
Hultgren - Tillis Engineers maintains a superior safety record.
Hultgren - Tillis Engineers' personnel have provided geotechnical engineering for process structures, new and rehabilitated tanks, horizontal and vertical vessels, pipelines and pipe racks, pump stations, vaults, cooling towers, and other components of industrial plants.
This includes a drug-free workplace, industrial site safety training, and TWIC badges.
Hultgren - Tillis Engineers maintains a superior safety record.
Hultgren - Tillis Engineers' personnel have provided geotechnical engineering for process structures, new and rehabilitated tanks, horizontal and vertical vessels, pipelines and pipe racks, pump stations, vaults, cooling towers, and other components of industrial plants.
Hultgren - Tillis Engineers provides geotechnical engineering services to owners, designers and builders of marine structures, including wharves, mooring dolphins, and tidal gate structures.
We have designed cantilevered and tied back bulkheads and Open Cell Walls.
Cemex Marine Terminal (Redwood City, CA) - The project included a new cement marine off-loading terminal and an electrical distribution station.
The project also included dredging the berth area to Elevation -37 feet (MLLW), cutting back the existing shoreline slopes to accommodate the planned dredge depths, providing shore protection against wave action, providing breasting dolphins consisting of 60-inch diameter monopiles, and concrete-pile-supported mooring dolphins.
We have designed cantilevered and tied back bulkheads and Open Cell Walls.
Cemex Marine Terminal (Redwood City, CA) - The project included a new cement marine off-loading terminal and an electrical distribution station.
The project also included dredging the berth area to Elevation -37 feet (MLLW), cutting back the existing shoreline slopes to accommodate the planned dredge depths, providing shore protection against wave action, providing breasting dolphins consisting of 60-inch diameter monopiles, and concrete-pile-supported mooring dolphins.
Hultgren - Tillis Engineers have provided geotechnical engineering services on numerous wastewater and water infrastructure projects, including pump stations, new and replacement sanitary sewers, wastewater outfalls, intake structures, maintenance buildings, lift stations, treatment ponds and embankments, treatment plants, canals and pipelines.
We provide geotechnical engineering services for public administration and health care buildings and parking structures.
City of Concord Parking Structure (Concord, CA) - The parking garage is a three-level structure.
We provide geotechnical engineering services for public administration and health care buildings and parking structures.
City of Concord Parking Structure (Concord, CA) - The parking garage is a three-level structure.
Reviews
Be the first to review Hultgren-Tillis Engineers.
Write a Review