FELCO, INC. provides engineering and land surveying services for the lower and mid Cape Cod area. In business for over 40 years, FELCO, INC. has consistently strived to provide state-of-the-art designs and services for residential and commercial construction. We understand the Cape's unique qualities and environmental assets, and our goal is to balance your needs while preserving the beauty that surrounds you.
Services
FELCO, INC. was created as a building corporation in 1960 and continued in the home-building field until the early 1980's.
At that time, FELCO, INC. began designing residential and commercial building sites with on-site sewage disposal systems, as required by the environmental statute commonly referred to as Title 5, the Massachusetts State Sanitary Code.
Today FELCO, INC. employs a group of highly skilled and experienced professionals.
Specializing in Title 5 Septic Plans, their knowledge and expertise merge environmental issues with design considerations to assist you in meeting the requirements for home building and development on the Cape.
At that time, FELCO, INC. began designing residential and commercial building sites with on-site sewage disposal systems, as required by the environmental statute commonly referred to as Title 5, the Massachusetts State Sanitary Code.
Today FELCO, INC. employs a group of highly skilled and experienced professionals.
Specializing in Title 5 Septic Plans, their knowledge and expertise merge environmental issues with design considerations to assist you in meeting the requirements for home building and development on the Cape.
Research is done at the Registry of Deeds in Barnstable for applicable deeds and surveyed plot plans.
A survey crew is sent to the property to locate, as necessary, lot boundaries, structures, roadways, topography, existing wells and sewage (on locus and also on abutting properties), wetlands, and other relevant information.
Once field work is completed, the information will be computed and drafted into a site plan.
A suitable location for the Title 5 System is then determined.
The client's preference for the location of the system can be implemented if options exist and code requirements can still be met.
A survey crew is sent to the property to locate, as necessary, lot boundaries, structures, roadways, topography, existing wells and sewage (on locus and also on abutting properties), wetlands, and other relevant information.
Once field work is completed, the information will be computed and drafted into a site plan.
A suitable location for the Title 5 System is then determined.
The client's preference for the location of the system can be implemented if options exist and code requirements can still be met.
Reviews
Be the first to review Felco.
Write a Review